ULiège at symposium “Pumps and turbines, challenges for management and design in Flanders”

On November 21, 2023, Joris Hardy from ULiège participated in the Symposium “Pumps and turbines, challenges for management and design in Flanders” organised at the Hydraulic Engineering Laboratory in Antwerp.

The event focused on fish safety in pumps and turbines. The audience consisted of waterway managers and manufacturers of pump turbines. Representing the academic institution and PLOTO project, Joris Hardy presented on waterway resilience and energy efficiency.

In the Session 2  “Research into energy efficiency/optimization of pumps/turbines” he introduced:

  1. How the PLOTO project examines waterway resilience to climate change by creating a multi-hazard model (climate, seismic, and flood) across three case studies (Hungary, Romania, Liège).
  2. ULiege’s contribution to the project, specifically our work on modelling floods caused by dike breaches along the Albert Canal and the River Meuse from Liège to Lanaye, along with our initial findings presented in a flood map.

Read about the full event at this link.

The pictures and presentation will follow soon.

ER12: Software for assessing socioeconomic impact 

ER12: Software for assessing socioeconomic impact 

PLOTO aims to improve the resilience of Inland WaterWays (IWW) and associated hinterland infrastructure against weather hazard, climate change effects, flooding, and seismic hazard. Part of the work that SoReCC is carrying out within PLOTO is to go one step beyond the...

ER11: Risk assessment engine 

ER11: Risk assessment engine 

Everyone has a different interpretation of risk. In business, risks are understood as threats to the operation and profitability of an organization. The assessment of risk then becomes a process of identifying pertinent threats and rating their likelihood and impact....

PLOTO M18 Plenary meeting

PLOTO M18 Plenary meeting

On 7-8 February, PLOTO partners met in Athens, hosted by the partner NTUA, to discuss the work done in the first 18 months of this EU funded initiative.  In light of the upcoming project's mid-term review, planned on 25 April, the Consortium aligned on the ongoing...